Sunday, 14, June, 2026

Veolia Energy Tashkent announced the launch of scheduled spring maintenance of its local boiler plants for April. This includes equipment repair and upgrades, replacement of worn parts, and pump checks to ensure stable operation during the heating season. Hot water will be temporarily shut off in some homes and businesses.

Shutdown schedule

Mirzo-Ulugbek district (5 days each)

April 6−10, boiler houses:

No. 1 Yugnakiy (Yugnakiy apt. building No. 6, 15, 19, 20, 21, 22, 23, 24, 25, 26, 26a, 26b; kindergarten No. 113; school No. 256),

No. 2/1 Farobiy (Yugnakiy apt. building No. 31, 32, 34, 35, 36, 37, 38, 44, 45; 34a OPM-112),

No. 3/1 Farobiy-3 (Yugnakiy apt. building No. 14, 16, 17, 18, 46, 47, 48, 49, 50, 51, 52; Project apt. building No. G-40; Preschool Educational Institution No. 382; school No. 120; Music school No. 20),

Geophysics (Ezoz apt. building Nos. 1, 2, 3, 4, 5, 6, 7; Geologist apt. building Nos. 8, 8a; Geophysics apt. building Nos. 39, 40, 41, 42, 43, 44; Yogdu apt. building Nos. 74, 75; Nikhol apt. building Nos. 1, 3; JSC Uzbekgeofizika),

school No. 71 (school No. 71, dormitory of the K. Bekzod Institute, DPND, BIY apt. building No. 42a, Personnel Retraining Center).

April 13-17, boiler houses:

No. 4/2 Traktorsozlar-2 (TTZ-1 apt. building Nos. 37, 38, 39, 40, 41, 42),

No. 5 Traktorsozlar-3 (TTZ-1 apt. building Nos. 25, 26, 27, 28, 29, 30, 31, 32, 33, 34; BIY apt. building Nos. 481, 483, 485; Preschool Educational Institution No. 98; school No. 211),

No. 6/2 Yuzrabot-2 (TTZ-1 apt. building Nos. 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24),

No. 14/1 Azamat-2 (TTZ-4 apt. building No. 14a, 16, 17, 18, 19, 20, 21, 22, 23, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, kindergarten No. 137; school No. 35; TTZ-4 pumping station),

No. 14/2 Azamat-3 (TTZ-4 apt. building No. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 24).

April 20-24, boiler houses:

No. 11/2 Uygonish-5 (TTZ-2 apt. buildings Nos. 51, 52, 53, 54, 55, 56, 57, 58, 59, kindergarten No. 375),

Oqituvchi (Oqituvchi apt. buildings Nos. 1, 1A).

April 27 - May 1

boiler house No. 4, Ulugbek settlement (Dustlik apt. buildings Nos. 1, 2, 3, 4, 5, 6, school No. 286, kindergarten No. 587).

Shaykhantakhur District (2 days each)

April 1-2

Uygur boiler house, 314 (Yangi shahar str., No. 8, 9, 6, Tsvet Met).

April 2-3

E. Bobokhon boiler house, 67 (Buston mahalla E. Bobokhon neighborhood apt. building: No. 12, 67).

April 16-17, boiler houses:

UchLola 1 (S. Darboza boiler house Uch Lola neighborhood apt. building: No. 1),

UchLola 5 (S. Darboza boiler house Uch Lola neighborhood apt. building: No. 5).

April 20−21, boiler houses:

Termiz 1 (S. Darboza str., Termiz neighborhood apt. building: No. 1),

Termiz 2 (S. Darboza str., Termiz neighborhood apt. building: No. 2).

April 27−28

boiler house of Yesenin, 118 (Ok tepa str., Majlisiy neighborhood, apt. building: No. 17, 19, 21, 23, 118).

Mirabad District (3 days each)

April 13-15

Bekhterevo-Sarakul boiler house (Bekhterova Sarakul str., apt. building Stations No. 1, 2, 3, 4, 5, 6, 7, 8, 9, school No. 294, kindergarten No. 197).

April 20-22

26 Bakinskikh Komissarov boiler house (Mirza Zhokhongir str., apt. building Stations No. 1, 2, 3, 4, 5, 6).

April 28-30

School 57 boiler house (Yorkin str.: school No. 57, dormitory No. 5, 6).

April 29 - May 1

Nukus boiler house 98 (apt. building No. 98).

Almazar District (2-3 days each)

April 27-28

Infectious Diseases Hospital No. 1 boiler house.

April 27-29

Sagbon boiler house 30 B (Chinniobod neighborhood, apt. building Nos. 10, 11, 12, 13).

April 29-30

Yangi Olmazor boiler house (Almazar City Residential Complex, Residential Buildings Nos. 11, 12, 15, 16).

April 29 – May 1

boiler houses:

Sagbon, 30 A (Chinniobod neighborhood, apt. buildings: Nos. 1, 2, 3, 4, 5),

Sagbon, 30 (Chinniobod neighborhood, apt. buildings: Nos. 6, 7, 8, 9).

Yashnabad District (3-5 days each)

April 1-3

Kiziltepa geologiya boiler house (M. Ashrafiy, neighborhood, Ashrafiy str., 70a, apt. buildings: 34/1, 34/2, 34/3, 34/4).

April 13-17

boiler house 22 Aviation Town (Fidoiylar neighborhood, apt. building lines: 25, 27, 8a, 8B, courthouse, SES building).

April 20-24

boiler house Fargona Yuli 95 (Zhurabek neighborhood, kindergarten No. 79, apt. building lines: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12; building 6, 32).

April 27 - May 1

Yangi Obod (Yangi Nur neighborhood, 28 Polyclinic, kindergartens No. 517 and 457, apt. buildings: 1, 2, 3, 4, 33, 33/1, 4, 5, 70/1, 2, 3, 28, 8, 7, 30, 31, 32, 33, 68/1).

Uchtepa District (3-5 days each)

April 15-17

UzSUMYA boiler house (Zakovat St. Pakhtakor neighborhood, apt. buildings: No. 5, kindergarten No. 386, school No. 81, UzSUMYA, UzNIIMEZ Clinic).

Chilonzor District

April 20-24

Kozirobod boiler house (Chilonzor street, Kozirobod neighborhood apt. building lines: No. 81, 83, 85).